IMPROVEMENT PLANS FOR 2015

  • Construction of a new industrial building
    Metal Work is currently spread over a covered area of around 15,000 m2 which includes the production departments, raw material storage areas, departments for assembly operations carried out by own personnel or by subcontractors, and relevant component parts warehouses. There are, however, some space issues.

    We aim to gain an additional covered area of 19,000 m2, to which we will transfer our assembly departments (plus some subcontracted work bays) in order to better situate the production areas and storage of some raw materials.
    During this process we will focus on energy savings and the reduction of emissions, which involves:
    - installation of photovoltaic panels on the roofs of the buildings (reducing emissions of CO2, SO2, NOx, and dust)
    - underfloor heating (with energy savings of 15% compared to a conventional heating system)
    - heating and cooling systems for buildings by means of geothermal heat pumps.
  • Elimination of the air treatment units instruction sheet
    At the moment, each product in the AIR TREATMENT UNITS (New Deal-Skillair-Bit) range contains an instruction sheet.
    This information is actually available on the Metal Work website, and is accessible in PDF format.
    The objective is to reduce paper consumption.
  • Improvement of fire-fighting equipment for machine tools
    The current system (fire valve, damper, emergency connection) guarantees that machines are stopped and isolated from the system in case of fire. Obviously fire extinguishing must take place independently, so there is no guarantee of a shutdown of all outbreaks generated by an event.
    The proposed system, through CO2 emissions, would ensure the complete extinction of any fire.